DRBA Ship Collision and Protection System — Delaware Memorial Bridge

Project Owner(s)

Delaware River and Bay Authority

Construction Value

$93 Million

Location

Delaware Memorial Bridge

Project Schedule

Project Overview

The Delaware River and Bay Authority (DRBA) awarded Richard E. Pierson Construction Co., Inc. the Construction Manager/General Contractor (CM-GC) contract to design and build a new vessel collision protection system for the Delaware Memorial Bridge — one of the most critical transportation links on the Eastern Seaboard. The bridge carries Interstate 295, connecting travelers between New York City and Washington, D.C., via the New Jersey Turnpike, with over 100,000 vehicles crossing daily.

The existing fender systems at both the northbound and southbound bridge spans were original to their respective construction dates in the 1950s and 1960s, and were no longer adequate to protect the structures from modern cargo vessels, which are significantly larger and faster than those of earlier decades. This project was undertaken to satisfy a federal mandate to enhance protection for critical bridges across the country.

Project Scope

R.E. Pierson Construction constructed eight (8) solid-fill “dolphin” cells in the Delaware River — four protecting each bridge tower — each measuring 80 feet in diameter. The cells were fabricated using 115-foot-long steel sheet piling and filled with sand and stone. Wick drains were installed into the riverbed to accelerate consolidation of existing sediments as each cell was filled, allowing water to be expelled upward as the material compressed under the weight of fill. Each dolphin cell took approximately three months to complete.

To access the work areas safely, R.E. Pierson constructed a 360-foot temporary trestle from the Delaware shoreline, enabling the transport of materials and personnel to barges stationed at each tower location. Large crane barges were mobilized throughout construction.

Each dolphin cell is located a minimum of 443 feet from the edge of the Delaware River’s 800-foot-wide navigation channel. The completed system protects the bridge from a vessel collision involving a neo-Panamax-class ship — up to 120,000 deadweight tonnage (DWT) traveling at approximately seven knots — larger than the container ship that struck Baltimore’s Francis Scott Key Bridge in March 2024.

Project Challenge

The project presented significant technical, environmental, and logistical challenges. All work was performed in active navigable waters of the Delaware River, requiring permits from the U.S. Army Corps of Engineers, U.S. Fish and Wildlife Service, the National Oceanic and Atmospheric Administration (NOAA), the U.S. Coast Guard, and state environmental agencies. A fishery restriction prohibited pile driving in the river from March 1 through June 30 each year, requiring careful scheduling of in-water activities. Seismic instrumentation was used to monitor vibrations on the existing bridge piers throughout construction, with weekly surveys conducted to detect any settlement or movement.

The protection system represents one of the largest freestanding cellular structure projects ever built in the United States.

Project Solution

R.E. Pierson was brought on early through the CM-GC delivery method, collaborating with the designer of record to develop an efficient, buildable solution. Through value engineering, the team eliminated dredging of cell material, utilized wick drains to accelerate sediment consolidation, and reduced the total amount of steel and concrete required — saving the DRBA approximately $25 million compared to earlier design estimates. The final project cost was approximately $93 million, partially funded by a $22.25 million U.S. Department of Transportation BUILD grant.

Upon completion, the system serves as a nationally recognized model for bridge collision protection, praised by DRBA and the broader bridge and highway community as a template for protecting critical infrastructure across the country.