Christina River Bridge


Delaware Department of Transportation
$28 Million
Wilmington, DE
May 2017 – July 2019
General Service Scope
Construction of a new multi span, segmented Bulb T Girder bridge across the Christina River. Installed 100’ prestressed concrete piles, Constructed sub structure and super structure and bridge approaches. Approach roadways required significant ground improvements. We utilized CMC’s, light weight fill and EPS Blocks. Bridge had significant architectural treatments, including formliner and lighting.


Project Challenge
Construction Access while minimizing impacts to the environment and marine traffic posed a significant challenge.
Project Solution
Utilized extensive marine fleet to construct the bridge with barge supported equipment.