Christina River Bridge

Project Owner(s)

Delaware Department of Transportation

Construction Value

$28 Million

Location

Wilmington, DE

Project Schedule

May 2017 – July 2019

General Service Scope

Construction of a new multi span, segmented Bulb T Girder bridge across the Christina River. Installed 100’ prestressed concrete piles, Constructed sub structure and super structure and bridge approaches. Approach roadways required significant ground improvements. We utilized CMC’s, light weight fill and EPS Blocks. Bridge had significant architectural treatments, including formliner and lighting.

Project Challenge

Construction Access while minimizing impacts to the environment and marine traffic posed a significant challenge.

Project Solution

Utilized extensive marine fleet to construct the bridge with barge supported equipment.