A brand-new R.E. Pierson website is coming very soon!
Job Fair - April 17, 2021 from 8 am to 12 pm
171 Gensinger Road, Kutztown, PA 19530
Interviews on the spot. Meet with HR and the rest of our management team.
Looking for experienced laborers, operators, pipe foreman and labor foreman.
Now hiring for PA Turnpike 476 NE Extension

PA Turnpike 476 NE ExtensionHS

Milepost A31.34 to A37.39, Montgomery County, PA

This $225M project consists of the full depth roadway reconstruction and widening of the Pennsylvania Turnpike; building it out from two lanes in each direction to three lanes in each direction and the replacement of four mainline bridges.

The project scope includes:


  • Demolition of one single-span steel bridge, two single-span reinforced concrete T-beam bridges, one three-span continuous steel bridge
  • The construction of two single span composite pre-stressed concrete box beam bridges, one single span composite pre-stressed concrete bulb-tee bridge, one three-span composite pre-stressed concrete bulb-tee bridge
  • Three box culverts extensions
  • One arch culvert extension
  • One box culvert replacement
  • Five mechanically stabilized earth retaining walls
  • Nine sound barrier walls
  • Three monopipe sign structures, and one monotube dynamic message sign structure
  • Thirty-nine basins/rain gardens
  • Over 500,000 tons of HMA paving
  • Nearly two-million cubic yards of excavation/embankment
  • The project was bid with an aggressive schedule beginning in early 2018 and is scheduled for completion in the summer of 2021.

    34 Photos